JD Cycles, Ilkley

My Account /My Basket »

0 items | total: £0.00


Skip to content (access key: s)




TIME Impact Cleat

£17.99

The one piece Impact café cleat has three integrated non-slip stabilizers. The widely placed polyurethane stabilizers grip the ground safely and provide excellent stability.
Code Colour Stock Level Delivery  
CH0187 Red Out of Stock Out of Stock

Product Details

These stabilizers are not part of the engagement system, and although highly resistant to abrasion they have no effect on retention even if worn down.

• Include wear indicators
• Lightweight
• Non-slip

TIME Impact Cleat: As with any product, specification is subject to change without prior notification. You are advised to confirm current specification before buying.

All heavy and bulky items are delivered via a courier and require a signature. Please contact our mail order team so your delivery requirements can be arranged.

Please note that postage charges shown only apply within the UK. If you want to place an order from outside the UK please contact our mail order department on 01943 816 101 extension 3.

Components by type

Browse by brand

Contact us anytime

Please feel free to call or email if you need any help.

Mail Order

mailorder@jdcycles.co.uk
01943 816101

Ilkley Shop and Service Centre

shop@jdcycles.co.uk
01943 816101